Real Case Studies
Real Case Studies
Home >
Real Case Studies
In the InnoWEE project the developed panes are installed in four different demo site building being InnoWEE real case studies.
The case studies are the following:
The Demo Sites have been chosen to have different structural/architectural characteristics of the buildings (historical, new and existing). Besides, they were chosen also to consider four different climate regions.
Based on the data collected and the solutions for the most performing outdoor and indoor walls and ceilings, specific rehabilitation project design for the real demo sites have been developed by Pietre Edil. The project designs included also the installation of the products that have been developed for each demo building in accordance to their geographical localization, its use and installation facilities.
After the panels were installed the monitoring stage has been started. The panels’ performance is measured in each real case study and the data will be later used for simulations for four virtual demo sites.